_As some may have already noticed, we are on the way to New Hampshire, hauling two cars, ours and SJSU's.

Be sure to check out the FH-2011 link above to keep up to date on our journey across America and our competition at Formula Hybrid 2011.

Here's our car a few days before we headed out:
_Don't forget to check out our latest video, located on the front page, of our car testing at Infineon Raceway. Many thank yous to Infineon Raceway and AFM for making that event possible.
 
_Finals this week for UCD students, which is good and bad. Good for us because no one is in the machine shop because they're studying. Bad for us because our members are studying and we can't utilize most of the open machine shop time. Regardless, with enough parts fabricated, we were able to piece the car together into a roller.
Picture


Steering knuckle machined and attached. This was this week's biggest project as it was the final and most crucial piece to get the car into 'roller' status.

Picture


HVE progressing even further.

Picture



Lots of elbow grease and one late night later, the car is now rolling.

Picture


HVE fitted into place for testing.

Picture



Car packed up and ready to head down to the bay area for a presentation.

_Team captain Matt Klein was invited down to give a presentation to the Electric Auto Association - Silicon Valley chapter, hence our big push to bring the car together. The presentation went very well and the car gathered much interest from the members of the EAA Silicon Valley chapter. They even graciously gave the UCD Formula Hybrid team a donation and treated the presenters to lunch! Thanks guys!
 
_Week 10 marks the end of winter quarter 2011 lectures for students at UC Davis. Here's this week's progress:
Picture
_

Further progress on the High Voltage Enclosure.

Picture



Rear suspension just about ready to go.

Picture


Front suspension started.

Picture



Old and new, side by side.

 
_Chassis has been finished and is now being painted. Focus has now switched to the vehicle's powertrain systems.
Picture


New chassis next to old chassis.

Picture


Upper half of our seat, minus final prep work.

Picture


Chassis sanded down and prepped for paint.




Picture



Few coats of primer.

Picture


High voltage enclosure and its components almost ready to go.

 
_Here is the long delayed week 7 and week 8 recap. I will let the pictures do the talking:

Picture


IC Engine back in place for now.

Picture


Steering assembly has been cut to length, machined, and detail-worked. All that is left is for final fitment and welding.

Picture


E-stop buttons and shoulder harness bar are tacked into place.

Picture


Rear cross braces and brake light tabs are welded in place.

Picture
_Differential/chain tensioner mounts are tacked in place.

Picture


Shifter linkages fabricated, awaiting final fitment and welding.

Picture




Cockpit cross braces fitted in place.

Picture



Gasoline fuel filler cap fitted in place.

Picture



Differential disassembled, awaiting rebuild/service.

Picture



Front bell cranks bored and bearings are fitted in place.