On Friday and Saturday the motor mounting was nearly completed along with the broaching of the sprockets used to connect the motor to our transmission.  Since both of the shafts that the sprockets are mated on happen to be odd metric sizes and machining a proper broaching tool would have been fairly time consuming we decided to go ahead and wire EDM the notches.  
A couple of set screws and a few other quick tasks are required to complete this project, but it should be functional within the end of the coming week.

Next up will be finishing the high voltage wiring so that we can get this thing up and running for testing!

Matt
Picture
Picture
Picture
Doug M.
3/7/2010 03:10:26 pm

Its officially a hybrid! Looks like things are coming together. Nice job guys!

Reply
10/1/2013 02:51:57 pm

I feel very lucky, very interesting, and I read a lot of articles, finally saw such a good article.

Reply



Leave a Reply.

    Archives

    May 2010
    April 2010
    March 2010
    February 2010
    December 2009
    October 2009

    Categories

    All